Tuesday, December 8, 2009

Iron Bracket Store Ma Hanging A Shelf On A Brick Wall?

Hanging a shelf on a brick wall? - iron bracket store ma

My house has 1968 a wall. The brick is only 1 / 2 inches thick, is just for decoration. Being optimistic, I think it's easier to live only with stones and friends are with her. I would probably hang two shelves that run along the wall, the simple construction, in essence, 10 meters long hours and 8 cm deep wooden board (or any combination there, like shelves 2 5 m long, etc.) enough ( Iron maybe?) believe parentheses below. It is necessary to take strong enough, probably about 80-100 pounds, hardcover and paperback.

The question is, how on earth can I support something like that? I need a special drill? What type of anchor? Is it necessary to support specific format to "leapfrog" stone and earth, only holes in the mortar ... Mortar is strong enough to withstand the media for a platform as big? How much media do I need? I am very helpful, but this wall was my enemy for 4 years.

8 comments:

claudy_k... said...

Johnny's answer was perfect and I would be 3 flat head screws thumb. They come in black. I in my brick house well, and as he did.

PuterPrs... said...

The biggest problem is the nails through the brick. If you can find them, then mount it by drilling brick and use 3 "screws your platform on the pole. Just do not pull the screws too tight or you'll break the bricks. C Is that what you do if you hang a mirror in the bathroom wall tile.

Johnny B said...

You can wait a masonry bit to spend the first part and then you put the screws to the wall studs for wood adequately support a shelf and hooks. Books are very heavy, so you can find behind the dugout to. You can use a stud finder.

petethen... said...

Their unanimous and see the nails used to support the load, a pilot hole for the pin with a masonry drill (for studies that are not pre-drill boring into her), then for screws with a hole smaller than the mounting screws for stud. One suggestion, if you have your nails the media believe that 15 / 8 not on the scale of the mounting holes should extend further than that, the focus would be best. The placement tranche is usually deterministic minend Pages pin 16 on the plateau Center 2.5 meters in two separate groups of 16, 5 shelves in three sections 16 m apart etc.Cant find the studs? Remove and check the motherboard, you can drill the holes that need to be protected if made.

petethen... said...

Their unanimous and see the nails used to support the load, a pilot hole for the pin with a masonry drill (for studies that are not pre-drill boring into her), then for screws with a hole smaller than the mounting screws for stud. One suggestion, if you have your nails the media believe that 15 / 8 not on the scale of the mounting holes should extend further than that, the focus would be best. The placement tranche is usually deterministic minend Pages pin 16 on the plateau Center 2.5 meters in two separate groups of 16, 5 shelves in three sections 16 m apart etc.Cant find the studs? Remove and check the motherboard, you can drill the holes that need to be protected if made.

Bert C said...

You should be a stud finder. Drill holes through the brick instead of the quantity needed to support a move towards a low wall. Then the real wall and bolt with a little regular appropriate size for your screws. Fasten brackets with screws at least 2 "long jump at the post. Spatiale not support more than 32") from another source (pins.

Bert

Bert C said...

You should be a stud finder. Drill holes through the brick instead of the quantity needed to support a move towards a low wall. Then the real wall and bolt with a little regular appropriate size for your screws. Fasten brackets with screws at least 2 "long jump at the post. Spatiale not support more than 32") from another source (pins.

Bert

billy brite said...

Everyone is on the right track, but you will never be the nail, if the contractor is a mesh layer and adhesion used to connect the thin brick.

When you drill through the tile, not a bundle, use 1 / 4 "screws Molly. These are the screws with a pair of jump wings, can lie. After pushing the already drilled holes in the wings, and A, you can support wedged between the tiles and the wall behind the stone to adapt. Just make sure to put the screw into the hole in the group before pressing the screw hole.

Post a Comment